What a second unit is
The City defines a second unit as a self-contained living space with its own cooking, sleeping and sanitary facilities, inside a detached house, a semi-detached house or a townhouse. In practice that is the basement apartment most people are describing.
Three separate sets of rules apply to it at once: the Ontario Building Code, the Ontario Fire Code, and the City's zoning by-law. They cover different things — construction and egress, fire separation and alarms, and what is permitted on your lot — and satisfying one of them does not satisfy the others.
The step people miss
A building permit does not make the unit legal
Mississauga requires second units to be registered with the City, and keeps a public register of them. The registration itself is free. What it asks for is proof of ownership, a completed registration form, and a copy of the second unit building permit signed off by every City inspector involved — which means the registration only happens once the work is actually finished and passed.
An unregistered unit is not a legal one, even if it was built under a permit. That distinction turns up during insurance claims and during sales, which is a bad time to discover it.
The City of Mississauga's own page on registering a second unit sets out the current documents and process. Check it directly rather than relying on any contractor's summary, including ours.
Where underpinning comes into it
Ceiling height
The Building Code sets minimum heights for habitable space, and which figure applies depends on how your project is classified — new construction, or an existing house being converted. Your designer confirms that for your address. What is not in dispute is that a basement measuring six and a half feet to the underside of the joists is short before the ducts are even considered.
A way out
Bedrooms need a means of escape, which is either a window sized to climb out of or a door directly outside. On a lowered basement, both of those are easier and cheaper to build while the floor is open — see egress windows and walkouts.
Fire separation
The unit has to be separated from the rest of the house, and the assemblies and alarms that achieve that are specified on the drawings. The ceiling is part of that, and it costs height — which is another reason to settle the floor level before the drawings are finished, not after.
Services and layout
The furnace, water heater, panel and the buried drain all sit in the space you are converting. Where they end up decides the layout, and moving them is easiest while the floor is already out.
A sensible order to do this in
Measure what you have
Slab to joist, in several places. Note the lowest duct and beam. That single number tells you whether this is a finishing project or a structural one.
Confirm the unit is permitted on your lot
Zoning first. There is no point designing a unit the by-law does not allow on your property.
Get a designer involved before a contractor quotes
The drawings determine the scope. A quote produced before them is a guess that will change.
Decide the structural method with the designer
Underpinning or benching, and which walls get which. This is a drawing decision, not a site decision.
Permit, build, inspect
The inspections are staged, and the sequence is tied to them.
Register the unit
Once every inspector has signed off. This is the step that makes the apartment legal.
What we do and what we do not
We do the structural half: lowering the floor, the foundation work, the walkout, the windows and the drainage. We do not prepare the second-unit drawings, we do not register the unit for you, and we will not tell you your basement complies — that is the designer's and the City's call, and anyone who tells you otherwise on a first visit has not seen your drawings either.